Precast concrete manufacturing process

Resources

Guidance before you order

Short, practical notes from our production and technical team to help you specify and receive the right product.

Google Map View Reviews

Technical notes

Specification & site guidance

These are general notes. For a specific project, send us the drawings or scope and we will advise directly.

R-01

Choosing a cabro thickness

60mm for pedestrian and light vehicle areas, 80mm for car parks and access roads, 100mm for heavy commercial and yard traffic.

R-02

Estimating paving quantities

Measure the paved area in square metres, add 5% for cuts at edges and curves, and confirm kerb linear metres separately.

R-03

Base preparation

Compacted hardcore, a graded sub-base and a 30–50mm sand bedding layer are what determine paving life more than the block itself.

R-04

Curing and handling

Units are cured before dispatch. On site, stack on level ground, avoid dropping edges and keep loads banded until laying.

R-05

Ordering and lead times

Standard items are supplied from stock where available; custom moulds and large volumes are scheduled into a production run.

R-06

Delivery planning

Confirm site access, offloading method and receiving hours before dispatch so trucks are not held at the gate.